Senior Engineer- Flexible Working Available

Location
Peterborough, Cambridgeshire
Salary
Competitive
Posted
08 May 2019
Closes
08 Jun 2019
Hours
Full Time
Contract Type
Permanent

*Morgan Sindall has a commitment to sourcing candidates directly and as such we do not accept speculative CV’s from agencies.*

About us:

Would you like to work for one of the most successful and secure companies within the UK Construction and Infrastructure industry with a vision to be a market leader across all of the sectors in which we operate?

Morgan Sindall provides national construction and infrastructure services to private and public sector customers across a comprehensive range of markets. We aim to create great results for our customers, partners, ourselves, and our employees.

With talented people as the key to our success we operate a culture whereby personal and professional development are at the forefront of our efforts to attract and retain the best people in the industry.

Opportunity:

We have a fantastic opportunity within our Rail & Electrification Business Unit for an ambitious and talented Senior Engineer to work on the Werrington Grade Separation Junction.

The Senior Engineer will ensure that above and below ground level a project is undertaken in accordance with the customers’ requirements for level and dimension.

Ideally this role would suit an ambitious, driven individual whom embraces the challenge of working within a high performing team. Experience of the Civils industry is required for this role.

Read more about our Rail work here - https://construction.morgansindall.com/rail

The Person:

  • HNC/HND in Building Studies (or equivalent)
  • SMSTS (5 day course)
  • Qualified First Aider
  • Relevant CSCS card 

About the Project:

Werrington Grade Separation Junction - circa £150m  

One of the worst bottlenecks on the East Coast main line is the junction at Werrington, near Peterborough.

Currently, slow moving freight trains using the Stamford lines and the Great Northern Great Eastern lines need to cross over three lines of the East Coast main line, causing high speed passenger trains to have to slow down. This multimillion pound investment will mean freight trains no longer need to do this but will instead dive under the East Coast main line.

Morgan Sindall is designing and building a new two-track railway line, more than 3km in length, under the East Coast Main Line at the Werrington Junction that will enable high-speed trains to pass over the Great Northern Great Eastern Line. Existing Stamford Lines will be widened to the west to create four tracks. The central pair of tracks will then dive into a new underpass, below the ECML, and rise to meet the GNGE line approximately 600m after.

Site investigations are well underway and Morgan Sindall is currently taking the GRIP 4 Design through to GRIP 5. Main site works are planned from late Summer 2

Similar jobs

Similar jobs